راقب
راقب

المطاحن سطح الدوارةBLANCHARD 20K-36

Michigan, الولايات المتحدة الامريكية

نظرة عامة

علامة تجارية
موديل
بطاقة الهوية
469410
حالة
تستخدم - تمت إعادة تشكيلها
السنة
1968
الموقع
Michigan
الولايات المتحدة الامريكية
رقم المخزن
16908
الوصف
Blanchard #20K-36, 36" Vertical Spindle Rotary Surface Grinder, Remanufactured W/ 1 YR Warranty
المواصفات
تحويل المواصفات للمتري
حجم الظرف36"
أفقى/رأسيVert
القدرة50 hp
الأرجحة38"
أسفل العجلة16"
قطر عجلة التجليخ20"

ورقة المواصفات

36" Magnetic Chuck Diameter3/8" Chuck Life18" Vertical Range20" Diameter of Wheel Chuck, Solid Wheel Style(6) Ranges of Chuck Speeds, 6, 9, 12, 18, 25, 33 RPMFeed 0.004 - 0.080 IPM720 RPM Wheel Speed50 HP, 3 Phase, 60 Cycle, 230/420 Volt, Floor Space 11'8"L x 8'4"W x 9'1"Max./8'8"Min. HeightApprox. Weight 13,500 lbs.Wet base (coolant in base)Thank you for choosing F. P. Miller Company to provide you with a quote on a purchase and re-manufacture of a Blanchard Rotary Surface Grinder. The scope of work would include:1) MACHINE DIS-ASSEMBLY:a) Completely disassemble machine & inspect parts and castings.b) Clean and wire brush all parts2) TABLE AND TABLE SUPPORT WAYS:a) Machine as required.b) Precision Scrape, fit the table support ways to the table ways.c) Installation of Moglice wear material in cup if needed.d) Grind magnetic chuck hardened bull gear 3) CARRIAGE AND BASE WAYS:a) Re-grind hardened base ways (Replace if needed)b) Precision scrape and fit carriage to base ways.c) Installation of cast iron wear strip if needed4) VERTICAL SLIDE AND COLUMN WAYS:a) Machine as requiredb) Precision scrape and fit the vertical slide ways to the column ways including the gibs.c) Replace or rebuild Elevating Screw and Nutd) Installation of cast iron insert material if needed.5) CARRIAGE AND TABLE DRIVE MECHANISMSa) Inspect and rebuild carriage drive assembly (including replacing bearings and seals).b) Replace Rack and Pinionc) Inspect and rebuild table drive assembly (including replacing bearings and seals).6) HEAD FEED MECHANISM:a) Inspect and rebuild head feed as required (including replacing bearings and seals).b) Inspect Feed worm gear and pinion, remove backlash.7) SPINDLE UNIT COMPLETE:a) Disassemble the spindle unit, clean and evaluate.b) Check spindle taper fit to wheel collar taper, and repair if required.c) Replace the upper and lower spindle bearingsd) Meg, clean and re-bake main motor windinge) Reassemble the spindle unit, and test.8) ELECTRICAL FEED MOTORS:a) Replace all Feed Motorsb) Replace bearings9) LUBRICATION SYSTEM:a) Install Automatic oil lubrication systemb) Remove all lube lines on the carriage, base and table.c) Replace  all lube blocks and clean oil ports on the carriage, base and table.d) Re-pipe with all new lines and fittings, the carriage, base and table.10) GREASE SYSTEM:a) Install new automatic grease systemb) Replace all lube lines on the column ways.c) Replace all lube blocks and clean oil ports on the column ways.d) Replace all lube fittings on the column.11) ELECTRICAL:a) All new wiring on machineb) New magnetic controllerc) All new limit switches and push button switches (placed to your configuration)d) New Electrical Control panel and components e) Install soft start for tablef) Updated Schematicsg) Updated manuals12) MAGNETIC CHUCK:a) Meg Magnetic Chuckb) Install New Magnetic Chuck Controls13) GUARDING AND COOLANT LINES:a) Replace all water guards b) Fit to machinec) Install new coolant Lines and External Clean Out Hose14) PAINT:a) Sand entire machine to original machine surface.b) Clean.c) Prime and paint grey. Will accommodate customers paint specs if possible15) REASSEMBLY OF MACHINE COMPLETE AND TEST:REQUIREMENTS:1. CONTRACTORS RESPONSIBILITY:F. P. Miller will be responsible for furnishing all services, labor, parts and materials necessary to rebuild the machine as described above.2. DIS-ASSEMBLY AND INSPECTION:-All areas and items of rebuild will be completely dismantled to basic parts and castings.-All parts and castings will be thoroughly inspected for defects.3. RE-UTILIZATION OF PARTS:-All parts that will be reused will be in such condition to assure proper part function and fit. This applies to parts which are used as is, as well as those that are repaired, or replaced.4. REPLACEMENT PARTS:-Replacement parts will be OEM or a suitable substitute.5. BEARINGS:-All bearings associated with spindle, regardless of condition, will be replaced with new bearings of the same type and precision class or better.6. SEALS AND GASKETS:-All seals and gaskets will be replaced with new seals and gaskets of a type equal to or better than original quality.7. FASTENING DEVICES:-All fastening devices will be inspected and all defective devices will be replaced.8. ACCEPTANCE TEST:-The machine will be run off at F. P. Miller Company with testing witnessed by customer.9. DOCUMENTATION:-Two complete sets of machine documentation covering-Electrical diagrams, maintenance and operating procedures, will be provided to customer10. TRANSPORTATION:-It is the customers responsibility for transportation from F. P. Miller Company, we can assist with arrangements upon request.-F. P. Miller will need Advanced Notice of Shipping Arrangements, prior to picking up machine, for proper time to package and prep machine11. DELIVERY:--Delivery of the machine will be approximately 20 weeks from the receipt P.O. and Down Payment and is dependent on availability of replacement parts and current shop schedule. The delivery will be held unless the lead-time of purchased items causes a delay.WARRANTY:F. P. Miller Company warrants the rebuild of this machine against defective materials and workmanship. The warranty terminates (12) months or 2000 operating hours, whichever occurs first, from delivery (some regional restrictions do apply). This applies only if the machine has been installed correctly and used in normal and proper manner under recommended operating conditions. Note: Warranty does not cover magnetic chuck unless it has been rewound during re-manufacturing process (see options below)AVAILABLE OPTIONS:Resurface Magnetic Chuck Rewind Magnetic ChuckSet up and run off in customers facility Stainless Steel Water GuardsCoolant SystemNew Drag Out Conveyor ($12,500.00) Included in priceTERMS: 30% with purchase order; 60% after acceptance run-off at F. P. Miller Company viewed by customer; 10% Net 30 Days after delivery of the machine to the customer upon approved credit.QUOTE IS VALID FOR THIRTY (30) DAYS
عن البائع

رؤية المزيد من العقارات المعروضة من هذا النموذج

thumb

BLANCHARD 20K-36

المطاحن سطح الدوارة

تستخدم - تمت إعادة تشكيلها | 1970 | Michigan, الولايات المتحدة الامريكية

رؤية المزيد من العقارات المعروضة من هذا النوع

thumb

BLANCHARD 11-16

المطاحن سطح الدوارة

Michigan, الولايات المتحدة الامريكية
thumb

BLANCHARD 11-20

المطاحن سطح الدوارة

Michigan, الولايات المتحدة الامريكية
thumb

BLANCHARD

المطاحن سطح الدوارة

Michigan, الولايات المتحدة الامريكية
thumb

BLANCHARD 18-42

المطاحن سطح الدوارة

1963 | Michigan, الولايات المتحدة الامريكية
عرض جميع

رؤية المزيد من العقارات المعروضة لهذه العلامة التجارية

thumb

BLANCHARD 11-16

المطاحن سطح الدوارة

Michigan, الولايات المتحدة الامريكية
thumb

BLANCHARD 11-20

المطاحن سطح الدوارة

Michigan, الولايات المتحدة الامريكية
thumb

BLANCHARD

المطاحن سطح الدوارة

Michigan, الولايات المتحدة الامريكية
thumb

BLANCHARD 18-42

المطاحن سطح الدوارة

1963 | Michigan, الولايات المتحدة الامريكية
عرض جميع