راقب
راقب

المطاحن سطح الدوارةBLANCHARD 26HACD-48

الولايات المتحدة الامريكية

نظرة عامة

علامة تجارية
موديل
بطاقة الهوية
470474
حالة
تستخدم - تمت إعادة تشكيلها
السنة
1996
الموقع
الولايات المتحدة الامريكية
رقم المخزن
16997
الوصف
Blanchard #26HACD-48, 48" Vertical Spindle Rotary Surface Grinder with A/B PLC, Re-manufactured W/ Warranty
المواصفات
تحويل المواصفات للمتري
قطر الظرف
48 "
عامود الدوران (أفقى/رأسى
Vert
القدرة
100 hp

ورقة المواصفات

Chuck Dia.: 48 inches



Spindle (Horz/Vert): vertical



Power: 100 horsepower



Table Speeds: (6) 6 to 33 RPM



Swing: 54 inches



Under Wheel: 24 inches



Grinding Wheel Width: No Specs Attached inches



Table Motor Horsepower: No Specs Attached horsepower



Grinding Wheel Dia.: 26 inches



CNC Control: no



Type of CNC Control: Allen Bradley PLC



Dimensions: No Specs Attached



Weight: 16500 pounds




Preliminary Specifications Subject to Verification: 26" Grinding Wheel Diameter (5 CDTL segments) 48" Magnetic Chuck Diameter56" Swing Inside Water Guards24" Vertical Range,Standard3000 LBS. Maximum Load on Chuck100 HP Grinding Wheel Horsepower480 Volt /60 Hertz Main Motor 576 RPM Wheel Speed6-24 RPM Chuck Speeds (variable)Machine Dimensions: 12'L-R x 63"D x 103-1/2"HElectrical Cabinet: 73"L-R x 20"D x 91"H ApproximateApprox. Weight: 17,000 lbs.Re-manufactured Blanchard Model 26HACD-48 All Electric Allen Bradley PLC Controlled, Vertical Spindle Rotary Table Surface Grinder   Thank you for choosing F. P. Miller Company to provide you with a quote on a re-manufactured #26HACD-48 Automatic Blanchard Rotary Surface Grinder. The work will consist of a mechanical rebuild and Allen Bradley PLC, drives and programming which includes specific items as follows:11) MACHINE DIS-ASSEMBLY:a) Completely disassemble machine & inspect parts and castings.b) Clean and wire brush all parts2) TABLE AND TABLE SUPPORT WAYS:a) Machine as required.b) Precision Scrape, fit the table support ways to the table ways.c) Installation of Moglice wear material in cup if needed.d) Grind magnetic chuck hardened bull gear 3) CARRIAGE AND BASE WAYS:a) Re-grind hardened base ways (Replace if needed)b) Precision scrape and fit carriage to base ways.c) Installation of cast iron wear strip if needed4) VERTICAL SLIDE AND COLUMN WAYS:a) Machine as requiredb) Precision scrape and fit the vertical slide ways to the column ways including the gibs.c) Replace or rebuild Elevating Screw and Nutd) Installation of cast iron insert material if needed.5) CARRIAGE AND TABLE DRIVE MECHANISMSa) Inspect and rebuild carriage drive assembly (including replacing bearings and seals).b) Replace Rack and Pinionc) Inspect and rebuild table drive assembly (including replacing bearings and seals).6) HEAD FEED MECHANISM:a) Inspect and rebuild head feed as required (including replacing bearings and seals).b) Inspect Feed worm gear and pinion, remove backlash.7) SPINDLE UNIT COMPLETE  (Geared Head):a) Disassemble the spindle unit, clean and evaluate.b) Check spindle taper fit to chuck collar taper, and repair if required.c) Disassemble, clean, inspect oil pump unit & repair if necessaryd) Replace upper and lower bearings and oil sealse) Meg main drive motor, clean, re-bake & rewind if necessary.f) Replace upper and lower bearings and oil seals.g) Reassemble the spindle unit and test.8)ELECTRICAL FEED MOTORS:a)Disassemble feed motors, clean and evaluate.b)Replace bearings9)LUBRICATION SYSTEM:a)Install Automatic oil lubrication systemb)Remove all lube lines on the carriage, base and table.c)Replace all lube blocks and clean oil ports on the carriage, base and table.d)Re-pipe with all new lines and fittings, the carriage, base and table.10)GREASE SYSTEM:a)Install new automatic grease systemb)Replace all lube lines on the column ways.c)Replace  all lube blocks and clean oil ports on the column ways.11)ELECTRICAL:a)All new wiring on machineb)New electrical panelc)All new limit switches and push button switches (placed to your configuration)d) New Allen Bradley PLC Control System and componentse)Install soft start for tablef)Updated Schematicsg)Updated manuals12)MAGNETIC CHUCK: a)Install New Magnetic Chuck Controls13)GUARDING AND COOLANT LINES:a)Replace all water guards b)Fit to machinec)Install new coolant Lines and External Clean Out Hosed)Include operators window e)Install Marpos gauge readout "Swinging shelf"14)PAINT:a)Sand entire machine to original machine surface.b)Clean.c)Prime and paint grey. "Will accommodate customers paint specs if possible"15)REASSEMBLY OF MACHINE COMPLETE AND TEST:REQUIREMENTS:1. CONTRACTORS RESPONSIBILITY:F. P. Miller will be responsible for furnishing all services, labor, parts and materials necessary to rebuild the machine as described above.2. DISASSEMBLY AND INSPECTION:-All areas and items of rebuild will be completely dismantled to basic parts and castings.-All parts and castings will be thoroughly inspected for defects.3. RE-UTILIZATION OF PARTS:-All parts that will be reused will be in such condition to assure proper part function and fit. This applies to parts which are used as is, as well as those that are repaired, or replaced.4. REPLACEMENT PARTS:-Replacement parts will be OEM or a suitable substitute.5. BEARINGS:-All bearings associated with spindle, regardless of condition, will be replaced with new bearings of the same type and precision class or better.6. SEALS AND GASKETS:-All seals and gaskets will be replaced with new seals and gaskets of a type equal to or better than original quality.7. FASTENING DEVICES:-All fastening devices will be inspected and all defective devices will be replaced.8. ACCEPTANCE TEST:-The machine will be run off at F. P. Miller Company with testing witnessed by customer.9. DOCUMENTATION:-Two complete sets of machine documentation covering-Electrical diagrams, maintenance and operating procedures, will be provided to customer10. TRANSPORTATION:-It is the customers responsibility for transportation from F. P. Miller Company, we can assist with arrangements upon request.-F. P. Miller will need Advanced Notice of Shipping Arrangements, prior to picking up machine, for proper time to package and prep machine11. DELIVERY:-Delivery of the machine will be approximately 22-24 weeks from the receipt P.O. and Down Payment and is dependent on availability of replacement parts and current shop schedule. The delivery will be held unless the lead-time of purchased items causes a delay.12. WARRANTY:F. P. Miller Company warrants the rebuild of this machine against defective materials and workmanship. The warranty terminates (12) months or 2000 operating hours, whichever occurs first, from delivery (some regional restrictions do apply). This applies only if the machine has been installed correctly and used in normal and proper manner under recommended operating conditions.  Note: Warranty does not cover magnetic chuck unless it has been rewound during re-manufacturing process (see options below)AVAILABLE OPTIONS:Coolant SystemNotes: a)Machine ships with new leveling pads TERMS: 30% with purchase order; 60% after acceptance run-off at F. P. Miller Company viewed by customer; 10% Net 30 Days after delivery of the machine to the customer upon approved credit.

عن البائع

رؤية المزيد من العقارات المعروضة من هذا النوع

thumb

BLANCHARD 11-16

المطاحن سطح الدوارة

Michigan, الولايات المتحدة الامريكية
thumb

BLANCHARD 11-20

المطاحن سطح الدوارة

Michigan, الولايات المتحدة الامريكية
thumb

BLANCHARD

المطاحن سطح الدوارة

Michigan, الولايات المتحدة الامريكية
thumb

BLANCHARD 18-42

المطاحن سطح الدوارة

1963 | Michigan, الولايات المتحدة الامريكية
عرض جميع

رؤية المزيد من العقارات المعروضة لهذه العلامة التجارية

thumb

BLANCHARD 11-16

المطاحن سطح الدوارة

Michigan, الولايات المتحدة الامريكية
thumb

BLANCHARD 11-20

المطاحن سطح الدوارة

Michigan, الولايات المتحدة الامريكية
thumb

BLANCHARD

المطاحن سطح الدوارة

Michigan, الولايات المتحدة الامريكية
thumb

BLANCHARD 18-42

المطاحن سطح الدوارة

1963 | Michigan, الولايات المتحدة الامريكية
عرض جميع