راقب
راقب

المطاحن سطح الدوارةBLANCHARD 54HD-100

الولايات المتحدة الامريكية

نظرة عامة

علامة تجارية
موديل
بطاقة الهوية
474308
حالة
تستخدم - تمت إعادة تشكيلها
السنة
1982
الموقع
الولايات المتحدة الامريكية
رقم المخزن
17003
الوصف
Blanchard #54HD-100, 100" Vertical Spindle Rotary Surface Grinder, Re-Manufactured W/ Warranty. 85'
المواصفات
تحويل المواصفات للمتري
قطر الظرف
100 "
عامود الدوران (أفقى/رأسى
Vert
القدرة
150 hp
الأرجحة
128 "
أسفل العجلة
48 "
قطر عجلة التجليخ
54 "

ورقة المواصفات

Chuck Dia.: 100 inches



Spindle (Horz/Vert): No Specs Attached



Power: 300 horsepower



Swing: 108 inches



Under Wheel: 60 inches



Table Speeds: 2.6, 4.1, 6.6, 10.2 RPM



Grinding Wheel Width: No Specs Attached inches



Table Motor Horsepower: No Specs Attached horsepower



Grinding Wheel Dia.: 54 inches



CNC Control: no



Type of CNC Control: No Specs Attached



Dimensions: 292" L x 158.5" W x 228" H (Aprox.)



Weight: 90200 pounds




100" Diameter Magnetic Chuck128" Swing Inside Water Guards (to be verified)54" Grinding Wheel Head Stock (12 Segments)300 HP Geared Head Design48" Vertical Travel (to be verified)(4) Table Speeds of 2.6, 4.1, 6.6, 10.2 RPM (@60Hz)(21) Incremental Down-feeds of .08 - .096 IPMDry Base MachineCortland Style Segment Holder1) MACHINE DIS-ASSEMBLY:a) Completely disassemble machine & inspect parts and castings.b) Clean and wire brush all parts2) TABLE AND TABLE SUPPORT WAYS:a) Machine as required.b) Precision Scrape, fit the table support ways to the table ways.c) Installation of Moglice wear material in cup if needed.d) Grind magnetic chuck hardened bull gear3) CARRIAGE AND BASE WAYS:a) Re-grind hardened base ways (Replace if needed)b) Precision scrape and fit carriage to base ways.c) Installation of cast iron way replacement if necessary on carriage ways4) VERTICAL SLIDE AND COLUMN WAYSa) Machine as requiredb) Precision scrape and fit the vertical slide ways to the column ways including the gibs.c) Replace or rebuild Elevating Screw and Nutd) Installation of cast iron way replacement if necessary on vertical slide.5) CARRIAGE AND TABLE DRIVE MECHANISMSa) Convert mechanical carriage traverse drive to Hydraulic Cylinder.b) Rebuild table drive assembly (including replacing all bearings and seals).6) HEAD FEED MECHANISM:a) Inspect and rebuild head feed as required (including replacing bearings and seals).b) Inspect Feed worm gear and pinion, remove backlash or replace if necessary7) SPINDLE UNIT (Geared head motor):a) Disassemble the spindle unit, replace helical gear set complete.b) Check spindle taper fit to chuck collar taper, and repair if required.c) Convert internal geared head oil pump to external mountd) Replace upper and lower bearings and oil sealse) Meg main drive motor, clean, re-bake & rewind if necessary.f) Replace upper and lower bearings and oil seals.g) Reassemble the spindle unit and test.8) ELECTRICAL FEED MOTORS:a) Replace all feed motors.9) LUBRICATION SYSTEM:a) Install Automatic Trabon oil lubrication systemb) Remove all lube lines on the carriage, base and table.c) Replace all lube blocks and clean oil ports on the carriage, base and table.d) Re-pipe with all new lines and fittings, the carriage, base and table.10) GREASE SYSTEM:a) Install new Graco automatic grease systemb) Replace all lube lines on the column ways.c) Replace all lube blocks and clean oil ports on the column ways.d) Replace all lube fittings on the column.11) ELECTRICAL:a) New wiring on machineb) New magnetic controllerc) New limit switches and push button switches (placed to your configuration)d) New electrical panel and componentse) Install soft start for tablef) Updated Schematicsg) Updated manuals12) MAGNETIC CHUCK:a) Install New Magnetic Chuck Controls13) SEGMENTED WHEEL HOLDER:a) Rebuild 54" Cortland Segmented Wheel holder complete14) GUARDING AND COOLANT LINES:a) Replace water guarding with newb) Fit to machinec) Install new coolant Lines and External Clean Out Hose15) PAINT:a) Sand entire machine to original machine surface.b) Clean.c) Prime and paint grey. Will accommodate customers paint specs if possible15) REASSEMBLY OF MACHINE COMPLETE AND TEST:REQUIREMENTS:1. CONTRACTORS RESPONSIBILITY:F. P. Miller will be responsible for furnishing all services, labor, parts and materials necessary to rebuild the machine as described above.2. DIS-ASSEMBLY AND INSPECTION:-All areas and items of rebuild will be completely dismantled to basic parts and castings.-All parts and castings will be thoroughly inspected for defects.3. RE-UTILIZATION OF PARTS:-All parts that will be reused will be in such condition to assure proper part function and fit. This applies to parts which are used as is, as well as those that are repaired, or replaced.4. REPLACEMENT PARTS:-Replacement parts will be OEM or a suitable substitute.5. BEARINGS:-All bearings associated with spindle, regardless of condition, will be replaced with new bearings of the same type and precision class or better.6. SEALS AND GASKETS:-All seals and gaskets will be replaced with new seals and gaskets of a type equal to or better than original quality.7. FASTENING DEVICES:-All fastening devices will be inspected and all defective devices will be replaced.8. ACCEPTANCE TEST:-The machine will be run off at F. P. Miller Company with testing witnessed by customer.9. DOCUMENTATION:-Two complete sets of machine documentation covering-Electrical diagrams, maintenance and operating procedures, will be provided to customer10. TRANSPORTATION:-It is the customers responsibility for transportation from F. P. Miller Company, we can assist with arrangements upon request.-F. P. Miller will need Advanced Notice of Shipping Arrangements, prior to picking up machine, for proper time to package and prep machine11. DELIVERY:-Delivery of the machine will be approximately 28 weeks from the receipt P.O. and Down Payment and is dependent on availability of replacement parts and current shop schedule. The delivery will be held unless the lead-time of purchased items causes a delay.WARRANTY:F. P. Miller Company warrants the rebuild of this machine against defective materials and workmanship. The warranty terminates (12) months or 2000 operating hours, whichever occurs first,  from delivery (some regional restrictions do apply). This applies only if the machine has been installed correctly and used in normal and proper manner under recommended operating conditions.  Note: Warranty does not cover magnetic chuck unless it has been rewound during re-manufacturing process (see options below)AVAILABLE OPTIONS:Set up and run off in customers facilityRewind Magnetic ChuckFrequency Variable Speed Table Drive ConversionTERMS: 30% with purchase order; 60% after acceptance run-off at F. P. Miller Company viewed by customer; 10% Net 30 Days after delivery of the machine to the customer upon approved credit.

عن البائع

الممزيد حول هذا النموذج

لعرض مزيد من المعلومات على BLANCHARD 54HD-100 ، بما في ذلك المعلومات التجارية، والصور، والفيديو، وأكثر من ذلك، انقر هنا .

رؤية المزيد من العقارات المعروضة من هذا النوع

thumb

BLANCHARD 11-16

المطاحن سطح الدوارة

Michigan, الولايات المتحدة الامريكية
thumb

BLANCHARD 11-20

المطاحن سطح الدوارة

Michigan, الولايات المتحدة الامريكية
thumb

BLANCHARD

المطاحن سطح الدوارة

Michigan, الولايات المتحدة الامريكية
thumb

BLANCHARD 18-42

المطاحن سطح الدوارة

1963 | Michigan, الولايات المتحدة الامريكية
عرض جميع

رؤية المزيد من العقارات المعروضة لهذه العلامة التجارية

thumb

BLANCHARD 11-16

المطاحن سطح الدوارة

Michigan, الولايات المتحدة الامريكية
thumb

BLANCHARD 11-20

المطاحن سطح الدوارة

Michigan, الولايات المتحدة الامريكية
thumb

BLANCHARD

المطاحن سطح الدوارة

Michigan, الولايات المتحدة الامريكية
thumb

BLANCHARD 18-42

المطاحن سطح الدوارة

1963 | Michigan, الولايات المتحدة الامريكية
عرض جميع