見る
見る

ロータリー平面研削盤BLANCHARD 26HACD-48

Michigan, アメリカ合衆国

概要

ブランド
モデル
ID
470474
条件
使用 - リビルト
1996
場所
Michigan
アメリカ合衆国
在庫No.
16997
詳細
Blanchard #26HAD-48, 48" Vertical Spindle Rotary Surface Grinder with A/B PLC, Re-manufactured W/ Warranty
スペック
メトリックに仕様を変換します
チャック サイズ48"
水平/垂直Vert
パワー100 hp

スペックシート

Chuck Dia.: 48 inches Spindle (Horz/Vert): vertical Power: 100 horsepower Table Speeds: (6) 6 to 33 RPM Swing: 54 inches Under Wheel: 24 inches Grinding Wheel Dia.: 26 inches Type of CNC Control: Allen Bradley PLC Weight: 16500 pounds Preliminary Specifications Subject to Verification: 26" Grinding Wheel Diameter (5 CDTL segments) 48" Magnetic Chuck Diameter56" Swing Inside Water Guards24" Vertical Range,Standard3000 LBS. Maximum Load on Chuck100 HP Grinding Wheel Horsepower480 Volt /60 Hertz Main Motor 576 RPM Wheel Speed6-24 RPM Chuck Speeds (variable)Machine Dimensions: 12'L-R x 63"D x 103-1/2"HElectrical Cabinet: 73"L-R x 20"D x 91"H ApproximateApprox. Weight: 17,000 lbs.Re-manufactured Blanchard Model 26HACD-48 All Electric Allen Bradley PLC Controlled, Vertical Spindle Rotary Table Surface Grinder   Thank you for choosing F. P. Miller Company to provide you with a quote on a re-manufactured #26HACD-48 Automatic Blanchard Rotary Surface Grinder. The work will consist of a mechanical rebuild and Allen Bradley PLC, drives and programming which includes specific items as follows: 1)     MACHINE DIS-ASSEMBLY:a) Completely disassemble machine & inspect parts and castings.b) Clean and wire brush all parts2) TABLE AND TABLE SUPPORT WAYS:a) Machine as required.b) Precision Scrape, fit the table support ways to the table ways.c) Installation of Moglice wear material in cup if needed.d) Grind magnetic chuck hardened bull gear 3) CARRIAGE AND BASE WAYS:a) Re-grind hardened base ways (Replace if required)b) Precision scrape and fit carriage to base ways.c) Installation of cast iron way replacement if required on carriage ways4) VERTICAL SLIDE AND COLUMN WAYSa) Machine as requiredb) Precision scrape and fit the vertical slide ways to the column ways including the gibs.c) Replace or rebuild Elevating Screw and Nutd) Installation of cast iron way replacement if required on vertical slide.5) CARRIAGE AND TABLE DRIVE MECHANISMSa) convert mechanical carriage drive to Hydraulic Cylinder- Complete.b) Rebuild table drive assembly (including replacing bearings and seals).6) HEAD FEED MECHANISM:a) Inspect and rebuild head feed as required (including replacing bearings and seals).b) Inspect Feed worm gear and pinion, remove backlash or replace if required7) SPINDLE UNIT (Geared head motor):a) Disassemble the spindle unit, rebuild or replace helical gear set complete.b) Check spindle taper fit to chuck collar taper, and repair if required.c) Convert geared head oil pump to external mount d) Replace upper and lower bearings and oil sealse) Meg main drive motor, clean, re-bake or rewind if required (additional cost)f) Replace upper and lower bearings and oil seals.g) Reassemble the spindle unit and test.8) ELECTRICAL FEED MOTORS:a) Rebuild or replace all feed motors including bearings9) LUBRICATION SYSTEM:a) Install Automatic oil lubrication systemb) Remove all lube lines on the carriage, base and table.c) Replace all lube blocks and clean oil ports on the carriage, base and table.d) Re-pipe with all new lines and fittings, the carriage, base and table.10) GREASE SYSTEM:a) Install new automatic grease systemb) Replace all lube lines on the column ways.c) Replace  all lube blocks and clean oil ports on the column ways.d) Replace all lube fittings on the column.11) ELECTRICAL:a) All new wiring on machineb) New magnetic controllerc) All new limit switches and push button switches (placed to your configuration)d) New Electrical panel and components.e) Install soft start for tablef) Updated Schematicsg) Updated manuals12) MAGNETIC CHUCK:a) Meg Magnetic Chuckb) Install New Magnetic Chuck Controls13) GUARDING AND COOLANT LINES:a) Replace water guarding with newb) Fit to machinec) Install new coolant Lines and External Clean Out Hose14) PAINT:a) Sand entire machine to original machine surface.b) Clean.c) Prime and paint grey. Will accommodate customers paint specs if possible15) REASSEMBLY OF MACHINE COMPLETE AND TEST:REQUIREMENTS:1. CONTRACTORS RESPONSIBILITY:F. P. Miller will be responsible for furnishing all services, labor, parts and materials necessary to rebuild the machine as described above.2. DIS-ASSEMBLY AND INSPECTION:-All areas and items of rebuild will be completely dismantled to basic parts and castings.-All parts and castings will be thoroughly inspected for defects.3. RE-UTILIZATION OF PARTS:-All parts that will be reused will be in such condition to assure proper part function and fit. This applies to parts which are used as is, as well as those that are repaired, or replaced.4. REPLACEMENT PARTS:-Replacement parts will be OEM or a suitable substitute.5. BEARINGS:-All bearings associated with spindle, regardless of condition, will be replaced with new bearings of the same type and precision class or better.6. SEALS AND GASKETS:-All seals and gaskets will be replaced with new seals and gaskets of a type equal to or better than original quality.7. FASTENING DEVICES:-All fastening devices will be inspected and all defective devices will be replaced.8. ACCEPTANCE TEST:-The machine will be run off at F. P. Miller Company with testing witnessed by customer.9. DOCUMENTATION:-Two complete sets of machine documentation covering-Electrical diagrams, maintenance and operating procedures, will be provided to customer10. TRANSPORTATION:-It is the customer’s responsibility for transportation from F. P. Miller Company, we can assist with arrangements upon request.-F. P. Miller will need Advanced Notice of Shipping Arrangements, prior to picking up machine, for proper time to package and prep machine11. DELIVERY:-Delivery of the machine will be approximately 23 weeks from the receipt P.O. and Down Payment and is dependent on availability of replacement parts and current shop schedule. The delivery will be held unless the lead-time of purchased items causes a delay.WARRANTY:F. P. Miller Company warrants the rebuild of this machine against defective materials and workmanship. The warranty terminates (12) months or 2000 operating hours, whichever occurs first, from delivery (some regional restrictions do apply). This applies only if the machine has been installed correctly and used in normal and proper manner under recommended operating conditions.  Note: Warranty does not cover magnetic chuck unless it has been rewound during re-manufacturing process (see options below)AVAILABLE OPTIONS:Convert Table drive to variable speed drive systemResurface Magnetic ChuckRewind Magnetic ChuckRewind main Spindle Set up and run off in customer’s facilityMachine will ship with new Unisorb leveling pads NOTE: Due to rising costs partly by unsteady pricing in purchased goods and supply chain issues, this quote is good for 30 days.  Prices are subject to change, please contact us to confirm price prior to issuing an order.TERMS: 30% with purchase order; 60% after acceptance run-off at F. P. Miller Company viewed by customer; 10% Net 30 Days after delivery of the machine to the customer upon approved credit
売り手について

このタイプのリストを参照してください

thumb

BLANCHARD 11-16

ロータリー平面研削盤

Michigan, アメリカ合衆国
thumb

BLANCHARD 11-20

ロータリー平面研削盤

Michigan, アメリカ合衆国
thumb

BLANCHARD

ロータリー平面研削盤

Michigan, アメリカ合衆国
thumb

BLANCHARD 18-42

ロータリー平面研削盤

1963 | Michigan, アメリカ合衆国
すべてを表示

このブランドのためのより多くのリストを参照してください

thumb

BLANCHARD 11-16

ロータリー平面研削盤

Michigan, アメリカ合衆国
thumb

BLANCHARD 11-20

ロータリー平面研削盤

Michigan, アメリカ合衆国
thumb

BLANCHARD

ロータリー平面研削盤

Michigan, アメリカ合衆国
thumb

BLANCHARD 18-42

ロータリー平面研削盤

1963 | Michigan, アメリカ合衆国
すべてを表示