PHI M369

  • Présentation du produit

    A complete tooling change can be performed in just minutes. Once the pipe is in place, the flange is formed in minutes. The whole operation — install tooling (if required), insert pipe, form the flange, remove the pipe — requires a maximum of 5 minutes. This compares favorably to the approximately 45 minutes required to weld a flange onto the pipe.

  • À propos de l'entreprise
Vous souhaitez acheter un nouveau PHI M369 ?

Distributeurs et Ateliers de service et de réparation